UT Dallas Design Guidelines & Construction Standards
ARCHITECTURAL & CIVIL STANDARDS
UTD Facilities Design and Construction Codes and Standard
1. Division One – General Requirement
01 31 00 – Project Administration
01 32 00 – Project Planning & Scheduling
01 35 23 – Project Safety Requirements
01 45 00 – Project Quality Control
01 77 00 – Project Closeout Procedures Rev. 05-03-11
01 91 00 – General Commissioning Requirements
2. Division Two – Existing Conditions (NOT USED)
3. Division Three – Concrete
03 30 00 – Concrete Sidewalks – Revised 2-15-12
4. Division Four – Masonry
04 21 00 – Brick Masonry Units
04 22 00 – Concrete Masonry Units
5. Division Five – Metals
6. Division Six – Wood, Plastics & Composites
06 40 23 – Interior Architectural Woodwork
06 41 00 – Architectural Wood Casework
7. Division Seven – Thermal & Moisture
07 13 00 – Sheet Membrane Waterproofing
07 14 00 – Fluid-Applied Waterproofing System
07 22 16 – Roof and Deck Insulation
07 51 00 – Asphalt Built-Up Roofing
07 52 00 – Modified Bituminous Roofing
8. Division Eight – Openings
08 11 00 – Metal Doors & Frames
08 11 16 – Aluminum Doors & Frames
9. Division Nine – Finishes
09 90 00 – Painting & Coatings
10. Division Ten – Specialties
10 28 00 – Toilet Access. Rev. 6-20-12
10 44 00 – Fire Extinguishers, Cabinets, & Accessories
11. Division Eleven – Equipment
11 13 19.23 – Stationary Loading Dock Lifts
12. Division Twelve – Furnishings
12 32 00 – Wood Laboratory Casework
13. Division Thirteen – Special Construction (Not Used)
14. Division Fourteen – Conveying Equipment
14 24 00 – Hydraulic Elevators
21. Division Twenty-One – Fire Suppression (NOT USED)
22. Plumbing
22 05 01 – Common Work Results for Plumbing
22.07 00 – Plumbing Insulation
22 10 00 – Plumbing Piping and Pumps
22 13 00 – Facility Sanitary Sewerage
23. Division Twenty-Three – Heating, Ventilating and Air Conditioning (HVAC)
23 00 00 – Heating Ventilating, and Air Conditioning (HVAC)
23 05 00 – Common Work Results for HVAC
23 09 23 – Energy Management System
23.10.00 – Facility Fuel Systems
23 64 01 – Air Cooled Water Chillers (Less than 150 Tons)
23 64 02 – Air Cooled Water Chillers (Greater Than 150 Tons)
25. Division Twenty-Five – Integrated Automation
26. Division Twenty-Six – Electrical
26 05 00 – Common Work Results for Electrical
26 10 00 – Medium Voltage Electrical Transmission
26 20 00 – Low Voltage Electrical Transmission
26 29 13 – Variable Frequency Drives
26 30 00 – Facility Electrical Power Generating & Storage Equipment
26 50 00 – Interior Exterior Lighting Fixtures
27. Division Twenty-Seven – Communications
https://wiki.utdallas.edu/wiki/display/IRDOCS/Standards-+Wiring
28. Division Twenty-Eight – Fire Alarm and Smoke Detection System
http://www.utdallas.edu/ehs/firelifesafety/
31. Division Thirty-One – Earthwork
31 11 01 – Temporary Tree Protection
32. Division Thirty-Two – Exterior Improvements
33. Division Thirty-Three – Utilities
34. Division Thirty-Four – Transportation
35. Division Thirty-Five – Waterway and Marine – Construction (NOT USED)
40. Division Forty – Process Integration (NOT USED)
41. Division Forty-One – Material Processing and Handling Equipment (NOT USED)
42. Division Forty-Two – Process Heating, Cooling, and Drying Equipment (NOT USED)
43. Division Forty-Three – Process Gas and Liquid Handling, Purification, and Storage Equipment (NOT USED)
44. Division Forty-Four – Pollution and Waste Control Equipment (NOT USED)
45. Division Forty-Five – Industry-Specific Manufacturing Equipment (NOT USED)
46. Division Forty-Six – Water and Wastewater Equipment (NOT USED)
48. Division Forty-Eight – Electrical Power Generation (NOT USED)