Projects
Guidelines :
Project reports should be returned by the deadline in order to be considered
for full credit. Reports should have the full name and student ID (optional) of
the author. In each report, a brief explanation of the formulas derived and
used by the student should be included along with the requested plots. The
plots should indicate clearly (e.g., with a legend) what the different curves
represent. A short paragraph (2-3 sentences long) for each set of plots will be
required to comment on the curves, describing the results found and proposing
their intuitive explanation(s). Readable hand-written reports are welcome .
· Project 1:
- performance of M/M/1 queue with faster arrival and service rate
- comparison of fixed and statistical multiplexing
Download project 1 in ps
or in pdf .
Deadline: January 30, 2009
· Project 2:
- probability of queuing in a M/M/m queue
- comparison of one versus multiple channels in statistical multiplexing
- recursive Erlang-B formula
Download project 2 in ps
or in pdf .
Deadline: February 6, 2009
· Project 3:
- impact of the service time
distribution on the average waiting time
Download project 3 in ps
or in pdf .
Deadline: February 25, 2009
· Project 4:
- performance of slotted system
with Poisson and geometric arrivals
Download project 4 in ps
or in pdf .
Deadline: March 3, 2009
· Project 5:
- performance comparison of coded
stop-and-wait ARQ protocol under different channel
conditions
Download project 5 in ps
or in pdf .
Deadline: March 27, 2009
· Project 6a:
TBD
·
Project 6b:
TBD
· Project 6c:
TBD
· Project 7:
- review a technical paper, then, re-derive the model
assuming that incorrect reception of ACK is not
negligible
Download paper in pdf
.
Not due
· Project 8:
- review a technical paper - extra points are earned for each error found in
the model presented in the paper
Download paper in pdf
.
Not due
BACK to
EE6340 homepage
If you have any problem regarding the format and/or the content of the documents, please contact Andrea Fumagalli (972-883-6853)